03 — KITCHEN RENOVATION

Kitchen Renovation — Rotterdam

A RENODAM project, completed in Rotterdam — 2 weeks. An outdated kitchen in Rotterdam was completely renovated in 2 weeks — including demolition, piping, plastering and installation.

Kitchen Renovation — Rotterdam — after
Kitchen Renovation — Rotterdam — before

Drag the slider to reveal the transformation

Location
Rotterdam
Timeline
2 weeks
Category
Kitchen renovation

The existing kitchen was very dated. They opted for a thorough renovation with wall relocation.

We took care of all preparatory work: demolition, new water/gas/electrical connections, plastering and levelling.

The result: a spacious, bright kitchen with a contemporary look and optimal functionality.

What we did
  • Demolition of old kitchen and wall relocation
  • New water, gas and electrical connections
  • Plastering and floor levelling
  • Installation of custom kitchen
  • Connection of all built-in appliances
  • Final finishing and cleaning

Ready to start your project?

Request a Quote ← All projects