03 — KITCHEN RENOVATION
Kitchen Renovation — Rotterdam
A RENODAM project, completed in Rotterdam — 2 weeks. An outdated kitchen in Rotterdam was completely renovated in 2 weeks — including demolition, piping, plastering and installation.
Drag the slider to reveal the transformation
The existing kitchen was very dated. They opted for a thorough renovation with wall relocation.
We took care of all preparatory work: demolition, new water/gas/electrical connections, plastering and levelling.
The result: a spacious, bright kitchen with a contemporary look and optimal functionality.
What we did
- Demolition of old kitchen and wall relocation
- New water, gas and electrical connections
- Plastering and floor levelling
- Installation of custom kitchen
- Connection of all built-in appliances
- Final finishing and cleaning